Clear The Air News Blog Rotating Header Image

Incineration – Solid Waste Disposal

Common sense in Hong Kong’s Clochemerle moment

Submitted by admin on Nov 8th 2012, 12:00am

Business

LAI SEE HOWARD WINN

Howard Winn

Will the incinerator re-emerge?

Australia’s Northern Territory government has shut down its quarantine incineration facility at East Arm Wharf in Darwin because of pollution concerns, ABC News reports. The Environmental Protection Authority (EPA) says there has been a continuing problem with the incinerator ever since it was set up six years ago.

Transport Minister Adam Giles says the government decided to shut the facility because it failed to meet new environmental standards. EPA chairman Bill Freeland says the incinerator was found to be emitting dioxins into the surrounding soil.

The incinerator was set up in 2006 to treat waste from commercial shipping and international flights. We hear the Hong Kong government has abandoned plans to build a monster HK$23 billion incinerator – or waste management facility as it prefers to call it – in the scenic environs of the island of Shek Kwu Chau off South Lantau.

However, the project’s official status is that it has been shelved, so there is still the possibility it will re-emerge. It was, after all, carefully nurtured by the previous secretary of the environment, Edward Yau Tang-wah, during Donald Tsang’s administration.

After his stellar career in this capacity he now rejoices in the title of Director of Office of the Chief Executive of Hong Kong, where hopefully environmental policy is spared his attentions.

Bursting population bubbles

Interesting to see the government’s appointment of 11 non-official members to the Steering Committee on Population Policy.

According to the government’s announcement: “The committee will identify the main social, economic, and policy challenges which require further study regarding changes to Hong Kong’s population profile in the next 30 years. It will recommend strategies and practical measures for pursuing the objectives of Hong Kong’s population policy, and advise on the priority of these measures.”

This is presumably a polite way of saying it wants to bring some sense to the ludicrous population assumptions that have been underpinning government infrastructure projects.

Readers will recall that the Census and Statistics Department recently lowered its projected population from 8.89 million to 8.47 million for 2041 – a 26 per cent decline – and justified it by using C.Y. Leung’s decision to ban mainland women without local partners from giving birth at local hospitals from next year.

But the government population projections have been way out of line for years, rather like John Tsang’s budget surplus projections. The latest forecast for this year is a population of 7.13 million and we are not expected to reach 8.3 million until 2036.

The Transport Department needs to pay attention to this since the “Third Comprehensive Transport Study” still appears to be using a forecast of 8.9 million to 10 million for 1997-2016. The closest we can get to this is 2041 when Hong Kong is forecast to have a population of 8.5 million.

Have you got any stories that Lai See should know about? E-mail them to howard.winn@scmp.com [1]

Topics:

Illegal structures

Buildings Department

Environmental Protection Authority

Incinerators

Steering Committee on Population Policy


Source URL (retrieved on Nov 8th 2012, 5:27am): http://www.scmp.com/business/article/1077311/common-sense-hong-kongs-clochemerle-moment

Letter to Environmental Panel Members re Waste Management and comments by Christine Loh on incineration

For the attention of the members of the Panel on Environmental Affairs

Dear Members,

Herewith some background information for you.

Ms Loh seems not to know that Hong Kong has had for a long time, a medical waste incinerator.

Neither does she  mention that 3000 tonnes per day of Municipal Solid Waste incinerated by Mass Burn old technology will require landfilling at infinitum 21-23% of the amount burned daily  in bottom ash and 7% toxic fly ash – thus prolonging Hong Kong’s requirement for landfills forever, whereas the EU has legislated to fine Governments who fail to reduce landfills, toxic ash and the off-gassing of methane. This stupid incineration  idea means the creation of man-made islands in the sea to become the new ash lagoons whereas a plasma gasification system has no such ash residues.

Meanwhile please also find information on a Chinese University of HK study in Macau and a similar  Imperial College UK study on the health impacts of living downwind of an incinerator.

Also note that HK will soon be adversely affected by pollution from unregulated incinerators being built just across the border from Hong Kong with a chart showing yearly wind directions across Hong Kong and hence their serious impact on our environment.

Kind regards,

James Middleton

Chairman

www.cleartheair.org.hk

http://www.timeout.com.hk/feature-stories/features/54386/christine-loh-kung-wai.html

Christine Loh Kung-wai

Posted: 6 Nov 2012

Air pollution, overflowing landfills, incinerators, reclamation and now the controversial Tai Po artificial beach: the new Undersecretary for the Environment, Christine Loh Kung-wai, sure has got her work cut out

Words by Shirley Zhao; photography by Calvin Sit

Wearing a pair of nerdy glasses, speaking in a calm, modest manner and emanating a composed, thoughtful air, Christine Loh Kung-wai shows little sign of her manic new life as Undersecretary for the Environment. Until she starts talking about it, that is. “My days are filled with meetings,” confesses the 56-year-old during our exclusive Time Out interview, offering up an overwhelmingly packed magazine-sized 8am-11pm itinerary of her daily engagements as proof. “On my busier days, I can have up to seven meetings,” she adds.

Indeed, Loh is a busy woman – but this is hardly a new development. As the former chief executive of think tank Civic Exchange, founder of the now defunct Citizens Party and member of LegCo on and off between 1992 and 2000, Loh has always led a demanding life in the public eye. But with her recent – and somewhat unexpected – appointment in CY Leung’s government as the Undersecretary for the Environment, her schedule has reached a whole new level.

With a reputation for being a progressive politician – and with a strong track record of campaigning for the environment – Loh’s appointment to the government has been deemed a breath of fresh air. And just as she settles into the hot seat – and as the controversial artificial beach plan in Tai Po gains huge public attention – Loh sits down with us to discuss how she plans to battle Hong Kong’s environmental dilemmas over her five-year term.

So, let’s start with the hot topic: Tai Po’s Lung Mei Beach. Why did you agree the government should go on with its artificial beach plan?
The idea for the beach arose following a request from the Tai Po District Council more than a decade ago. It had been through many procedures, including obtaining funding for building the beach earlier this year from LegCo. We believe that development and conservation can go hand-in-hand and there could be a win-win solution. By taking proactive initiatives to preserve the ecological environment of the Ting Kok coastline and parts of Tolo Channel, the longstanding decision for the Lung Mei Beach project would go ahead.

Environmental groups say Lung Mei’s waters include harmful elements so it’s not suitable for an artificial beach. They are also planning a judicial review because they say the government didn’t include the quality of Lung Mei’s waters in its environmental assessment report. What’s your response?
The government is providing a new sewage network in Lung Mei and its vicinity to improve water quality. The construction is underway and will be completed next year. The water quality of Lung Mei has improved from Grade 4 to Grade 2 in recent weeks. It’s a marked improvement. We are confident that, in 2015, when Lung Mei Beach is open to the public, the water quality will meet the required standard. We will continue to monitor its water quality and publish the monitoring results regularly. More recently, NGOs have raised the issue that there is dumped mud in the water with heavy metals. We are looking into that right now.

The Lung Mei beach issue is the talk of the moment. But there’s lots more to talk about as well. What else are you working on?
Topics such as air pollution, water quality, energy, conservation and waste are all within our range of responsibilities. Actually I’m doing all of these. We will put a lot of effort in dealing with air pollution and waste because there is great public demand. Hong Kong has a fantastic biodiversity and Hong Kong people are very interested in our natural assets. I hope, during this term of the government, we will have a much more robust policy on protecting nature and restoring areas where we have damaged. Actually everything is important in our portfolio – but there are major initiatives to be launched for air quality, waste and conservation.

What are those initiatives?
For example, there is public and expert consensus on dealing with air pollution. In the coming year we will announce policy initiatives on roadside pollution, emissions from ships and regional co-operations between Hong Kong and Guangdong. On roadside pollution we will have measures to reduce emissions from diesel commercial vehicles like vans and buses–they are the major polluters, as well as commercial vehicles like minibuses and taxis. I can’t disclose the details yet because we need to battle for money for our policies. No money no talk, right?

Former environment secretary Sarah Liao Sau-tung wanted to introduce road pricing to cut traffic but top civil servants persuaded her not to do so. Will you be as easily persuaded?
I will look at it from a different angle. There are different types of methods to deal with roadside pollution. One is to deal with the emissions source – the vehicles. If you can make the vehicles pollute less – for example through switching to a cleaner fuel or buying a cleaner vehicle – it will be a very fast way of lowering pollution. The second type involves urban planning such as pedestrianising areas so people are separated from vehicles. That requires you to design a whole area and reroute all the traffic. It’s an effective method, if you can do it, but it’s very complicated. The third method is financial planning and that is Electronic Road Pricing. You have to design the system and then put in place an electronic foundation. If you ask me which of these is the low-hanging fruit, I would say the vehicles. That’s the fastest way to have some beneficial changes.

Hong Kong has been criticised as having an air quality standard much lower than the international standard. Will you work on that as well?
The last government had already announced the tightening of the standards. We’re going to put it in legislation. That will be coming soon.

How soon?
In less than six months.

The plan to build an incinerator at Shek Kwu Chau has stirred up much controversy as well. What do you think of the plan?
Does Hong Kong need an incinerator? I think the answer is clearly yes. Right now, all the waste goes to our landfills. It’s not sustainable. If we can reduce the amount of waste we produce, will we still need an incinerator? The answer is yes. Hong Kong does not have an incinerator [for disposed waste] right now. We can argue about whether we need two or three but I think we need one. Some people may be objecting to the location or prefer this technology rather than that technology – but they are not saying no to an incinerator. So we need to be very clear about what people are supporting and objecting to.

Where’s the incinerator plan on your agenda?
It’s not just about the incinerator. It’s about waste management. Waste is a huge issue. We have waste that can be reused quite easily. We have food waste which is really challenging to deal with. We also have electronic waste, construction and demolition waste, and very difficult waste like clinical waste. Right now they all go to the landfills but they all require some different handlings. For the first time, Hong Kong is talking about investing in a comprehensive, foundational waste handling and disposal system. For such a rich city as Hong Kong, we are doing it rather late. It’s just so important to Hong Kong, because this defines how we’re going to deal with different types of waste. Hong Kong now has a sludge treatment plant being built in Tuen Mun [set to be completed next year]. This is a big scale incinerator to deal with sludge. We also need to build an organic waste treatment plant. At the same time, we need to reduce waste. The next thing we are going to do is consult the public again on how the charging system could work. This is another major piece of work that will come in the next year.

Do you mean the government has set its mind and will go on with the waste charging plan?
The last government had one round of consultation on whether we should have a waste charging plan and I think the answer is yes. We are some years away from actually charging but we are definitely very committed to moving towards it.

How long will it take for the comprehensive waste treatment plan to be completed?
Actually, it will take way beyond the time that I’m in the government. We are talking about a 10-year plan.

What do you think will be the biggest challenges to seeing your policies work effectively?
I’ll put it this way. I’ll tell you what I would like to do. First of all, I would like to help people see the broad picture of environmental infrastructure. Everything has a cost and people may not like it. In the coming year I want to show Hong Kong people what the investments are and how it will make their lives different. I want to spend a lot of time engaging with the media, stakeholders, experts and the public. We’ve already had one round of engagement with experts as well as environmental groups on air quality. I’d like to compare Hong Kong’s development in this field with other places so that people can see what cities have moved before us and what cities are behind us. With our level of development, we are lucky because we can afford to invest in building an infrastructure [to protect the environment]. We need successive generations of government to be committed to it, otherwise we won’t make it.

But currently Hong Kong people don’t seem to trust the government. Will that be one of the challenges?
I think people in Hong Kong are reasonable. If you put out a clear plan and if you are able to explain what the plan is for and why we need it, Hong Kong people are willing to listen. I do want to explain to people very carefully and in great depth ‘why’, so people understand [our policies]. I think we owe them that explanation. So hopefully, in the environment, with clear, well-explained and hopefully well-designed policies, we will get public support.

Do you think your inclusion into the government means that Beijing has realised the SAR needs to draw on a bigger pool of talent –
even including people from the broad pro-democratic camp?

I didn’t talk to Beijing so I don’t know what Beijing thinks. My discussions have initially been with the Chief Executive Mr CY Leung and subsequently with the Secretary for the Environment, Mr KS Wong. I accepted the offer to join the government because I think they are serious about doing something for the environment and I think I can help.

Do you think we will see more people from the pro-democratic camp joining the government?
I don’t know.

Do you hope so?
I don’t know. I’m looking at just my area where I can do something

Christine Loh Kung-wai

http://www.timeout.com.hk/feature-stories/features/54386/christine-loh-kung-wai.html

http://www2.padshowoff.com/content/normal/25267__DSC4816.jpg

Air pollution, overflowing landfills, incinerators, reclamation and now the controversial Tai Po artificial beach: the new Undersecretary for the Environment, Christine Loh Kung-wai, sure has got her work cut out

Words by Shirley Zhao; photography by Calvin Sit

Wearing a pair of nerdy glasses, speaking in a calm, modest manner and emanating a composed, thoughtful air, Christine Loh Kung-wai shows little sign of her manic new life as Undersecretary for the Environment. Until she starts talking about it, that is. “My days are filled with meetings,” confesses the 56-year-old during our exclusive Time Out interview, offering up an overwhelmingly packed magazine-sized 8am-11pm itinerary of her daily engagements as proof. “On my busier days, I can have up to seven meetings,” she adds.

Indeed, Loh is a busy woman – but this is hardly a new development. As the former chief executive of think tank Civic Exchange, founder of the now defunct Citizens Party and member of LegCo on and off between 1992 and 2000, Loh has always led a demanding life in the public eye. But with her recent – and somewhat unexpected – appointment in CY Leung’s government as the Undersecretary for the Environment, her schedule has reached a whole new level.

With a reputation for being a progressive politician – and with a strong track record of campaigning for the environment – Loh’s appointment to the government has been deemed a breath of fresh air. And just as she settles into the hot seat – and as the controversial artificial beach plan in Tai Po gains huge public attention – Loh sits down with us to discuss how she plans to battle Hong Kong’s environmental dilemmas over her five-year term.

So, let’s start with the hot topic: Tai Po’s Lung Mei Beach. Why did you agree the government should go on with its artificial beach plan?
The idea for the beach arose following a request from the Tai Po District Council more than a decade ago. It had been through many procedures, including obtaining funding for building the beach earlier this year from LegCo. We believe that development and conservation can go hand-in-hand and there could be a win-win solution. By taking proactive initiatives to preserve the ecological environment of the Ting Kok coastline and parts of Tolo Channel, the longstanding decision for the Lung Mei Beach project would go ahead.

Environmental groups say Lung Mei’s waters include harmful elements so it’s not suitable for an artificial beach. They are also planning a judicial review because they say the government didn’t include the quality of Lung Mei’s waters in its environmental assessment report. What’s your response?
The government is providing a new sewage network in Lung Mei and its vicinity to improve water quality. The construction is underway and will be completed next year. The water quality of Lung Mei has improved from Grade 4 to Grade 2 in recent weeks. It’s a marked improvement. We are confident that, in 2015, when Lung Mei Beach is open to the public, the water quality will meet the required standard. We will continue to monitor its water quality and publish the monitoring results regularly. More recently, NGOs have raised the issue that there is dumped mud in the water with heavy metals. We are looking into that right now.

The Lung Mei beach issue is the talk of the moment. But there’s lots more to talk about as well. What else are you working on?
Topics such as air pollution, water quality, energy, conservation and waste are all within our range of responsibilities. Actually I’m doing all of these. We will put a lot of effort in dealing with air pollution and waste because there is great public demand. Hong Kong has a fantastic biodiversity and Hong Kong people are very interested in our natural assets. I hope, during this term of the government, we will have a much more robust policy on protecting nature and restoring areas where we have damaged. Actually everything is important in our portfolio – but there are major initiatives to be launched for air quality, waste and conservation.

What are those initiatives?
For example, there is public and expert consensus on dealing with air pollution. In the coming year we will announce policy initiatives on roadside pollution, emissions from ships and regional co-operations between Hong Kong and Guangdong. On roadside pollution we will have measures to reduce emissions from diesel commercial vehicles like vans and buses–they are the major polluters, as well as commercial vehicles like minibuses and taxis. I can’t disclose the details yet because we need to battle for money for our policies. No money no talk, right?

Former environment secretary Sarah Liao Sau-tung wanted to introduce road pricing to cut traffic but top civil servants persuaded her not to do so. Will you be as easily persuaded?
I will look at it from a different angle. There are different types of methods to deal with roadside pollution. One is to deal with the emissions source – the vehicles. If you can make the vehicles pollute less – for example through switching to a cleaner fuel or buying a cleaner vehicle – it will be a very fast way of lowering pollution. The second type involves urban planning such as pedestrianising areas so people are separated from vehicles. That requires you to design a whole area and reroute all the traffic. It’s an effective method, if you can do it, but it’s very complicated. The third method is financial planning and that is Electronic Road Pricing. You have to design the system and then put in place an electronic foundation. If you ask me which of these is the low-hanging fruit, I would say the vehicles. That’s the fastest way to have some beneficial changes.

Hong Kong has been criticised as having an air quality standard much lower than the international standard. Will you work on that as well?
The last government had already announced the tightening of the standards. We’re going to put it in legislation. That will be coming soon.

How soon?
In less than six months.

The plan to build an incinerator at Shek Kwu Chau has stirred up much controversy as well. What do you think of the plan?
Does Hong Kong need an incinerator? I think the answer is clearly yes. Right now, all the waste goes to our landfills. It’s not sustainable. If we can reduce the amount of waste we produce, will we still need an incinerator? The answer is yes. Hong Kong does not have an incinerator [for disposed waste] right now. We can argue about whether we need two or three but I think we need one. Some people may be objecting to the location or prefer this technology rather than that technology – but they are not saying no to an incinerator. So we need to be very clear about what people are supporting and objecting to.

Where’s the incinerator plan on your agenda?
It’s not just about the incinerator. It’s about waste management. Waste is a huge issue. We have waste that can be reused quite easily. We have food waste which is really challenging to deal with. We also have electronic waste, construction and demolition waste, and very difficult waste like clinical waste. Right now they all go to the landfills but they all require some different handlings. For the first time, Hong Kong is talking about investing in a comprehensive, foundational waste handling and disposal system. For such a rich city as Hong Kong, we are doing it rather late. It’s just so important to Hong Kong, because this defines how we’re going to deal with different types of waste. Hong Kong now has a sludge treatment plant being built in Tuen Mun [set to be completed next year]. This is a big scale incinerator to deal with sludge. We also need to build an organic waste treatment plant. At the same time, we need to reduce waste. The next thing we are going to do is consult the public again on how the charging system could work. This is another major piece of work that will come in the next year.

Do you mean the government has set its mind and will go on with the waste charging plan?
The last government had one round of consultation on whether we should have a waste charging plan and I think the answer is yes. We are some years away from actually charging but we are definitely very committed to moving towards it.

How long will it take for the comprehensive waste treatment plan to be completed?
Actually, it will take way beyond the time that I’m in the government. We are talking about a 10-year plan.

What do you think will be the biggest challenges to seeing your policies work effectively?
I’ll put it this way. I’ll tell you what I would like to do. First of all, I would like to help people see the broad picture of environmental infrastructure. Everything has a cost and people may not like it. In the coming year I want to show Hong Kong people what the investments are and how it will make their lives different. I want to spend a lot of time engaging with the media, stakeholders, experts and the public. We’ve already had one round of engagement with experts as well as environmental groups on air quality. I’d like to compare Hong Kong’s development in this field with other places so that people can see what cities have moved before us and what cities are behind us. With our level of development, we are lucky because we can afford to invest in building an infrastructure [to protect the environment]. We need successive generations of government to be committed to it, otherwise we won’t make it.

But currently Hong Kong people don’t seem to trust the government. Will that be one of the challenges?
I think people in Hong Kong are reasonable. If you put out a clear plan and if you are able to explain what the plan is for and why we need it, Hong Kong people are willing to listen. I do want to explain to people very carefully and in great depth ‘why’, so people understand [our policies]. I think we owe them that explanation. So hopefully, in the environment, with clear, well-explained and hopefully well-designed policies, we will get public support.

Do you think your inclusion into the government means that Beijing has realised the SAR needs to draw on a bigger pool of talent –
even including people from the broad pro-democratic camp?

I didn’t talk to Beijing so I don’t know what Beijing thinks. My discussions have initially been with the Chief Executive Mr CY Leung and subsequently with the Secretary for the Environment, Mr KS Wong. I accepted the offer to join the government because I think they are serious about doing something for the environment and I think I can help.

Do you think we will see more people from the pro-democratic camp joining the government?
I don’t know.

Do you hope so?
I don’t know. I’m looking at just my area where I can do something

East Arm quarantine incinerator shut down

http://www.abc.net.au/news/2012-11-06/east-arm-quarantine-incinerator-shut-down/4356552?section=nt

East Arm quarantine incinerator shut down

The Northern Territory Government has shut down its quarantine incineration facility at East Arm Wharf in Darwin because of pollution concerns.

The Environmental Protection Authority (EPA) says there has been an ongoing problem with the incinerator for the past six years.

Transport Minister Adam Giles says the Government decided to shut the facility because it fails to meet new environmental standards.

The incinerator was set up in 2006 to treat waste from commercial shipping and international flights.

EPA chairman Dr Bill Freeland says the incinerator was found to be emitting dioxins into the surrounding soil.

He says alternative arrangements for the waste are being established.

“There will be waste coming in every day and currently it is being stored, and arrangements are being put in place … to actually get that all sealed up and trucked to a proper facility to South Australia,” he said.

Mr Giles says the Territory receives about one shipping container of bio-hazard waste from international aircraft and ships every day.

“I want to make sure that people see Darwin Port as a clean port,” he said.

Maple Ridge News – Cache Creek mayor wants toxic incinerator ash gone

http://www.mapleridgenews.com/news/176052791.html

Cache Creek mayor wants toxic incinerator ash gone

CacheCreekLFaerial-7web.jpg

By Maple Ridge News
Published: October 26, 2012 05:00 PM
Updated: October 26, 2012 05:425 PM

Cache Creek Mayor John Ranta is demanding the removal of nearly 2,000 tonnes of hazardous waste ash that he says was illegally sent to the regional landfill his village hosts from Metro Vancouver’s Burnaby incinerator.

Fly ash from the waste-to-energy plant’s scrubbers had higher than allowed levels of leachable cadmium in July and August but was shipped to the Cache Creek landfill because incinerator operator Covanta was slow to report the test results.

“An inappropriate substance has been deposited in there,” Ranta said. “Whoever is responsible should have the material removed.”

Metro officials have said they are working with the environment ministry to determine whether the deposited fly ash must be removed.

Some of the tested samples contained more than double the concentration of cadmium B.C. allows for dumping in municipal landfills.

Ranta said the landfill isn’t licensed to accept hazardous waste and it was “simply wrong” for it to be sent there, putting landfill workers and the local environment at risk.

Cache Creek residents don’t take such matters lightly, Ranta said, noting they blockaded the Trans Canada Highway to keep millions of dead chickens from being dumped there during the avian flu outbreak of 2004.

Covanta has apologized for the reporting error, saying it was not intentional.

Fraser Valley Regional District politicians say the incident underscores why they don’t trust Metro’s drive to build a new waste-to-energy plant.

“Ultimately this is Metro Vancouver’s responsibility,” FVRD vice-chair Patricia Ross said. “They let this slip through the cracks. This does not give us any confidence whatsoever.”

She noted the incident might never have been discovered or made public had landfill operator Wastech not realized in late September that the usual test results had stopped arriving and demanded them.

When Covanta did hand over the results they did not flag the failed readings, according to a Wastech memo to Metro staff obtained by Black Press.

“The company (Covanta) made no mention of the irregularity in the test results and made no mention of concern with the hazardous waste material sent to the Cache Creek landfill,” the Wastech memo said.

It also reveals that it was Wastech’s decision, not Metro’s, to suspend all deliveries of fly ash to the landfill on Sept. 26 over safety concerns.

Metro has instead been sending incinerator ash to a Hinton, Alberta landfill, after staging some of it initially at the Annacis Island sewage treatment plant.

Subsequent loads of fly ash have tested within limits and Covanta is working to determine whether the exceedances were due to a testing error or the problems with the method used to stabilize the cadmium in the ash.

Cadmium is a carcinogenic metal found in batteries and some plastics.

The Burnaby incinerator burns 285,000 tonnes of garbage per year.

Covanta is one of the expected bidders to build a new waste-fired plant, expected to handle 370,000 tonnes per year.

Find this article at:
http://www.mapleridgenews.com/news/176052791.html

Waste disposal plans back on government’s agenda

Contentious landfill issue needs to be dealt with in next five years, environment official says

Saturday, 27 October, 2012, 12:00am

Jolie Ho and Olga Wong

  • ·        1ed7a20f37af035679fe6c286d19fc54.jpg

Undersecretary for the Environment Christine Loh discusses a landfill problem with Tseung Kwan O residents at Lohas Park Community Hall. Photo: Sam Tsang

Controversial waste disposal plans including landfill expansion look set to return to the city’s agenda, even as residents call for the closure of the Tseung Kwan O rubbish facility.

Undersecretary for the environment Christine Loh Kung-wai yesterday described landfills as a problem left by the previous administration.

“Maybe I am unfortunate; the ‘wok’ [meaning a big mess] has landed in my lap,” Loh said.

“Are there shortcomings in previous [environmental] policies? Maybe yes. The new administration has about five years and we will make a good start [on waste disposal] during this time.”

Loh was responding to criticism from a Tseung Kwan O resident that the government had done a poor job in managing waste in the past 15 years.

Another resident also complained about the landfill. “It is so near our homes,” said Ng Mei-lan, 61, who lives on the 45th floor of a residential block in Wan Po Road, where dozens of rubbish trucks go past every day on their way to the landfill.

“We breathe in not only stinky air, but also toxic elements from construction waste. The ash [in my home] is terrible and my health has deteriorated two years after I moved here.”

The two were among about 100 residents Loh met at the Lohas Park Community Hall after her two-hour visit to the Tseung Kwan O landfill yesterday morning. They called for a complete shutdown of the facility this year.

Loh said it was impossible not to expand the landfill, given the considerable amount of waste generated daily.

The authorities would work on alleviating the problems, including the smell, noise, air pollution and the rubbish trucks. Residents had complained about leaked solid and liquid waste being left on the road, she said.

Loh did not comment on the construction of incinerators as it is subject to judicial review.

“I definitely hear their pain,” she said. “But it’s extremely difficult at this stage to put aside [plans of] landfill expansion and an incinerator … It’s difficult to give up [the two plans]. I personally think we are slow in reducing waste.”

Secretary for the Environment Wong Kam-sing said waste disposal was a long-standing problem and required public consensus to resolve it.

In April, the Environment Bureau abandoned a HK$23 billion plan to expand landfills in Tseung Kwan O, North District and Tuen Mun, and to build a waste incinerator on Shek Kwu Chau, off the southern coast of Lantau, as members of the Legislative Council public works subcommittee and Finance Committee withheld their support. Then-environment minister Edward Yau Tang-wah said new plans were needed before landfills became full in 2018.

Incinerator firm slow to tell Metro of failed ash tests

http://www.missioncityrecord.com/news/175833161.html

wastetoenergyfacilityMV-bing-7web.jpg

Scrubbers at Metro Vancouver’s waste-to-energy facility remove metals like cadmium before they go up the stack. But the ash collected was found to exceed provincial limits in July and August.

By Jeff Nagel – Surrey North Delta Leader
Published: October 25, 2012 11:00 AM

Fly ash from Metro Vancouver’s garbage incinerator that tested high in toxic cadmium in July and August has been contained at the Cache Creek landfill.

But Metro officials say they’re still trying to determine why waste-to-energy plant operator Covanta Energy was slow to inform the regional district of the test failures.

About 2,000 tonnes of the fly ash, which is particulate collected from scrubbers that keep toxic metals from going up the stack, was trucked to the Interior landfill.

Provincial regulation requires the ash pass two different tests to ensure it can be safely dumped at a landfill.

Solid waste manager Paul Henderson said there was a range of sample results, but the highest cadmium readings were more than double the provincial limit.

“It wasn’t marginally over the limit, they were substantially over the limit,” he said.

The main test, done at the end of each month, usually comes back with results within three weeks.

But Metro wasn’t informed of both failures until Sept. 26 – about a month later than should have happened for the failed July test results and a day after Cache Creek landfill operatorWastech noticed the results were late and demanded the data.

“We’re working closely with Covanta to understand what happened with regard to those communication issues,” Henderson said. “They’ve told us to date there was human error in the communication.”

Cadmium exists in minute quantities in municipal garbage, from sources such as batteries, dyes and some films and plastics, Henderson said.

Environment ministry officials will decide whether the ash that was trucked to Cache Creek can stay there or has to be taken to a special waste facility.

Subsequent tests on it there found most of the sampled material is within provincial limits.

Every truckload of fly ash produced at the Burnaby incinerator since Sept. 25 has been individually tested and found to be within limits, Henderson said.

But Metro took the added precaution of shipping it to a landfill near Hinton, Alberta until more is known.

Henderson said it didn’t make sense to pile in more new ash at Cache Creek if it’s decided the July and August shipments require special treatment.

He said Metro doesn’t believe the local environment or the Wastech workers at Cache Creek were at risk, but added both Metro and the landfill operator want to ensure no ash is ever delivered again that exceeds limits.

It’s the first time in 12 years incinerator fly ash samples failed testing.

Air emissions from the Metro incinerator have always been within operating limits and are not affected by the fly ash incident, Henderson said.

Covanta Energy said in a statement it believes the summer failures were an “aberration” and the fly ash sent to Cache Creek should not be considered hazardous waste.

The firm said it’s checking its ash-conditioning process to ensure it’s working properly and there are no future problems.

“We deeply regret this event and are working to resolve this lapse in communication,” the statement said. “At no time was information related to this issue purposefully withheld.”

Surrey Coun. Marrvin Hunt, who sits on Metro’s zero waste committee, said fly ash from the initial years of the incinerator’s operation went to the long-closed Coquitlam landfill until approval was gained to send it to Cache Creek.

He said fly ash typically hardens into a cement-like material that should pose no hazard at Cache Creek.

“The greatest concern is the lack of timely reporting,” Hunt said.

Washington State landfill operator Rabanco – which has repeatedly tried to land Metro Vancouver as a customer – said its Roosevelt Regional Landfill has a special cell for incinerator ash and could accept Metro ash shipments by rail, eliminating the need for it to be trucked to Alberta.

Sweden runs out of garbage, forced to import from Norway

http://www.mnn.com/lifestyle/recycling/blogs/sweden-runs-out-of-garbage-forced-to-import-from-norway

Sweden, a recycling-happy land where a quarter of a million homes are powered by the incineration of waste, is facing a unique dilemma: The nation has run out of much-needed fuel.

Thu, Oct 25 2012 at 9:30 AM EST

a recycling center in trash-strapped Sweden

Sweden, birthplace of the SmörgåsbordEric Northman, and the world’s preferred solar-powered purveyor of flat-pack home furnishings, is in a bit of a pickle: the squeaky clean Scandinavian nation of more than 9.5 million has run out of garbage. The landfills have been tapped dry; the rubbish reserves depleted. And although this may seem like a positive — even enviable — predicament for a country to be facing, Sweden has been forced to import trash from neighboring countries, namely Norway. Yep, Sweden is so trash-strapped that officials are shipping it in — 80,000 tons of refuse annually, to be exact — from elsewhere.

You see, Swedes are big on recycling. So big in fact that only 4 percent of all waste generated in the country is landfilled.

Good for them! However, the population’s remarkably pertinacious recycling habits are also a bit of a problem given that the country relies on waste to heat and to provide electricity to hundreds of thousands of homes through a longstanding waste-to-energy incineration program. So with citizens simply not generating enough burnable waste to power the incinerators, the country has been forced to look elsewhere for fuel. Says Catarina Ostlund, a senior advisor for the Swedish Environmental Protection Agency: “We have more capacity than the production of waste in Sweden and that is usable for incineration.”

Public Radio International has the whole story (hat tip to Ariel Schwartz at Co.Exist), a story that may seem implausible in a country like garbage-bloated America where overflowing landfills are anything but scarce.

As mentioned, the solution — a short-term one, according to Ostlund — has been to import (well, kind of import) waste from Norway. It’s kind of a great deal for the Swedes: Norway pays Sweden to take its excess waste, Sweden burns it for heat and electricity, and the ashes remaining from the incineration process, filled with highly polluting dioxins, are returned back to Norway and landfilled.

Ostlund suggests that Norway might not be the perfect partner for a trash import-export scheme, however. “I hope that we instead will get the waste from Italy or from Romania or Bulgaria or the Baltic countries because they landfill a lot in these countries,” she tells PRI. “They don’t have any incineration plants or recycling plants, so they need to find a solution for their waste.”

‘I wouldn’t want a waste facility near my home’ says Veolia director

http://www.mrw.co.uk/news/i-wouldnt-want-a-waste-facility-near-my-home-says-veolia-director/8637618.article?blocktitle=Latest-news—recycling-and-waste-management&contentID=2182

‘I wouldn’t want a waste facility near my home’ says Veolia director

A boss at Veolia has said he would not want to live near one of his firm’s waste incinerators.

Speaking at an industry policy event, the waste giant’s executive director for external affairs, Robert Hunt, said planning for waste facilities was a big issue because nobody wanted one built near them.

“I don’t think I’d want a waste facility near my home, I have to say”, Hunt added.

He said that while “in a democracy everybody’s got to have their say” on planning issues, the time taken to get planning permission made it difficult to attract foreign investment. The infrastructure planning system needed to be faster and more efficient, he added.

Chief operating officer at the London Waste and Recycling Board (LWaRB), Wayne Hubbard, disagreed with Hunt. Hubbard, also speaking at the Westminster Energy, Environment and Transport Forum event, said the planning system was delivering waste infrastructure.  The regime, he argued, distinguishes between large thermal treatment plants and smaller waste facilities which are less problematic.

“I don’t buy this received wisdom that planning is an issue”, he said, “but planning is definitely an issue for certain types of infrastructure”.

Hubbard said there was a need to focus more on smaller merchant facilities with more flexibility to respond to changes in market requirements.

“It’s okay to have the big waste infrastructure as long as it’s backed up by a load of other stuff that will come from entrepreneurial, smaller waste management companies”, he said.

Campaigner Shlomo Dowen of UK Without Incineration Network slammed Hunt’s comments on planning. He said the firm had a “blind spot” in respecting local residents and Hunt should “stop blaming the people for shortcomings in Veolia’s business model”.

“Growing rejection of incineration is about much more than the planning system”, added Dowen.

Waste output drops for the first time in four years

http://www.waste-management-world.com/index/from-the-wires/wire-news-display/1764043279.html

Ada Lee
South China Morning Post
October 18, 2012

The amount of waste produced in Hong Kong dropped 9 per cent last year – the first dip in four years – but the amount of food waste, a key concern for environmentalists, increased.

The biggest drop was in waste for recycling – down 16 per cent – and the average quantity of solid waste disposed of at landfills decreased 2.6 per cent to 13,458 tonnes a day, while construction waste dropped 7 per cent, according to the government.

The reduction of recycling waste was especially obvious in plastics, with a fall of 47 per cent.

Friends of the Earth’s environmental affairs manager Celia Fung Sze-lai attributed this decrease to the gloomy economy in Europe, as recycling companies tended to receive less waste when the prices were depressed.

Fung said yesterday the city was also receiving less plastic waste from overseas to be transferred to other places, such as the mainland. Her group had been told by recycling companies that the recycling price for plastic had dropped from 7,000 yuan a tonne last year to 4,500 yuan recently, due to a smaller demand in the mainland and overseas.

Fung also said the increase in food waste was worrying, and urged the government to come up with comprehensive strategies to recycle it.

Friends of the Earth said the government had revised waste figures for 2007 and 2008. If the original figures were taken into consideration, the decrease in waste production would be the first since 2005.

The government said the amount of construction waste dumped in landfills had dropped by half since charges for dumping construction waste were introduced in 2006.

Fung agreed the scheme was effective and noted that many construction companies now reused construction waste. The public’s sense of environmental issues had also increased, and owners tended to carry out less unnecessary home renovation.

Disposal of domestic waste had also dropped cumulatively by 15 per cent since 2004, the government said.

But Fung said the city’s landfills would soon be full and the government should implement a waste-charging scheme as soon as possible. “Although the amount has dropped, Hong Kong is still producing a lot of waste. It should focus on reducing waste from the source.”

Copyright 2012 South China Morning Post Ltd.All Rights Reserved

South China Morning Post